    蜜桃视频中文字幕脫硫係統中水泵的安裝順序

    蜜桃视频中文字幕脫硫係統中水泵的安裝順序:

    Installation sequence of water pump in biogas desulfurization system:
    1、起吊和運輸時,起吊附件能保證吊件的支撐。提升泵電機底座應從泵和電機或底座的下部提升。提升單個泵應從泵進口法蘭和支架上的吊環螺栓處提升。
    1. During lifting and transportation, the lifting accessories can ensure the support of the lifting parts. The lifting pump motor base shall be lifted from the lower part of the pump and motor or base. Lifting individual pumps shall be lifted from the lifting eyebolts on the pump inlet flange and support.
    2、短期儲存/保管。當總成需要臨時存放時,泵存放在幹燥的地方,以免受到灰塵或腐蝕的影響。不應拆除泵入口和出口法蘭上的保護盤。
    2. Short term storage / safekeeping. When the assembly needs temporary storage, the pump shall be stored in a dry place to avoid the influence of dust or corrosion. The protective plates on the pump inlet and outlet flanges shall not be removed.
    3、基礎驗收及處理,根據蜜桃视频中文字幕脫硫係統中水泵安裝圖對基礎的尺寸和位置進行複檢檢查;混凝土基礎具有足夠的強度,以確保安*並按照相關標準進行安裝。混凝清理,表麵不得有油汙或鬆散層。放置墊片的基礎表麵應平整。
    3. Foundation acceptance and treatment: recheck the size and position of the foundation according to the installation drawing of the water pump in the biogas desulfurization system; The concrete foundation shall have sufficient strength to ensure safety * and be installed in accordance with relevant standards. After coagulation cleaning, the surface shall be free of oil stain or loose layer. The foundation surface on which the gasket is placed shall be flat.
    4、整機就位、整平、灌漿,泵一般采用二次灌漿對基礎預留洞進行整平。將地腳螺栓插入泵座的螺栓孔,裝上墊圈,擰上螺母。對基礎地腳螺栓預留孔進行灌漿,待混凝土凝固後擰緊地腳螺栓上的螺母,檢查標高並校正,用無收縮水泥砂漿對泵底座進行二次灌漿,並用混凝土填充底座下方的空間,確保無氣孔。焊接底座應澆注在槽鋼底座的上表麵。安裝電機後,進行校正。
    4. The whole machine is in place, leveled and grouted. The pump generally adopts secondary grouting to level the reserved hole of the foundation. Insert the anchor bolt into the bolt hole of the pump base, install the washer and screw the nut. Grout the reserved holes of foundation anchor bolts, tighten the nuts on the anchor bolts after the concrete is solidified, check the elevation and correct it, use non shrinkage cement mortar to conduct secondary grouting on the pump base, and fill the space under the base with concrete to ensure that there are no pores. The welded base shall be cast on the upper surface of the channel steel base. After installing the motor, correct it.
    本文的精彩內容由生物脫硫提供知識提供,本網站還有很多的精彩內容,更多的內容您可以點擊進入:http://www.oagood.com蜜桃免费在线视频有專門的客服為您解答問題
    The wonderful contents of this article are provided by the knowledge of biological desulfurization. There are many wonderful contents on this website. You can click to enter more contents: http://www.oagood.com We have special customer service to answer your questions